The past couple years have been notable for lack of delivery of new protected cycle tracks after the boom in 2020 and 2021. Progress may be picking up, but this depends when the many schemes under development are actually constructed. We’ve heard some are actually years away.
There were a few new tracks constructed in the last year: in inner London this includes Islington extending C50 along Caledonian Road, and with Camden, extending the York Way tracks; and Hackney extending tracks on Queensbridge Road. Changes weren’t limited to inner London either. Hounslow continued to extend C9, Waltham Forest extended Hoe Street, Havering completed a short section of protected track in Romford, and Barking & Dagenham installed a few sections, too. Some councils also continue to upgrade Covid era wands to permanent infrastructure.
This year we also have a new map for displaying protected cycle tracks, only showing those that meet our criteria. The map we previously shared covered lots more, including TfL designated cycle routes that do not include physical protection, or were aligned via parks or canals. This map was useful as an overview of the cycle network in London, but it was not clear what on the map was being counted as part of the cycle track indicator.
The new map solves this problem, as it shows only what is measured by the Scorecard. It was created by analysing the data from the old map, filtering out what didn’t meet the criteria, and doing an audit of the entire mapping. We checked through each borough, but it’s likely there are some things we missed. Councils and campaigners were sent the mapping and asked to inform us of anything that was incorrect.
As a result of the mapping, some boroughs have seen a substantial drop in their score. It should be stressed that this is not as a result of removing cycle tracks. Rather, the totals have been revised due to segments being double counted in the past, lengths calculated incorrectly, or conditions not meeting the criteria. Over the next year we will continue to check the new mapping. If you’d like to help with this, please get in touch.
We also changed how we calculate the percentage of roads with cycle track coverage. We have always counted cycle tracks per direction, so a 100m bidirectional track is counted as 200m. We’d then divide this by the total road length in each borough to get the percentage of coverage. This meant theoretically a borough could have more than 100% cycle track coverage. We have now doubled the road length for the calculation (even a one-way road could have a contraflow track on it) and recalculated the percentage for previous years.